| Address: Oktjabrskiy Avenue 312-a Builder: “Bereg Storygroup” LLC Prime contractor: “Promzhilstroy” affiliated undertaking of “Niklaevstroy” Joint Venture Building license SACS (State Architectural and Construction Supervision): AB № 208614 of 09.02.2005 The 2nd construction stage includes two 10-floored brick-built sections of the house, a children’s playground and parking space. List of apartment equipment: Deck floor – cement fill Ceiling – reinforced concrete plates Ceiling height: Ground floor – 8th floors: 2, 5m 9th floor: 3, 00m Walls – plastered Windows and balcony doors – reinforced plastic with single-compartment glass units Reinforced plastic bay windows Metal window grates – on the ground floor Metal entrance doors (ready for covering) Electricity supply: Triple core copper wiring input into the apartment, to the power distributor; the electricity supply meters are installed in the staircase landing Heating: from the city TPP circuit, interconnection layout though-out the apartment with heating device installation as well as meter equipment installation for the registration of heat carrier energy consumption in each apartment Cold water pipeline – from the city circuit; input with water installation without interconnection layout throughout the apartment Hot water pipeline – from the house boiler room, input into the apartment with water meter installation, without interconnection layout throughout the apartment Gas supply: input into the apartment with gas meter installation, without stoves installation Sanitary piping: plastic pipes input into the apartment without interconnection layout Plumbing equipment isn’t installed Wired-radio outlet in each apartment TV – community antenna with interconnection layout to each apartment Views: Bugskiy costal lake, the park, the city |